x
"

INFECTION PREVENTION AND CONTROL PROGRAM

For the new health care facilities, Agon will cover the following phase:

  • Infection prevention and control, considerations in the design phase
  • Infection prevention and control considerations in the construction and infrastructure phase.
  • Selection of top medical, sterilization and treatment equipment for rapid, safe and reliable services
  • Selection and recruitment of qualified personnel
  • Build the infection control polices and procedure that will be followed.
  • Full Training and certification plan for the team
  • Accreditation Phase (National and International)

Existing facilities, Agon will provide services as follows:

  • Conduct a gap analysis study for the current infection control procedures and system
  • Budgeted Corrective Action Preventive Action (CAPA) plan will be issued to correct all the current
  • gaps in the system and preventing anticipated hazards
  • Issue all the missed procedures and system
  • Training and coaching plan to build up an IPC team
  • Accreditation Phase (National and International), if required.
Download pdf